{"id":4992,"date":"2022-09-20T10:13:28","date_gmt":"2022-09-20T10:13:28","guid":{"rendered":"https:\/\/van-elle.co.uk\/?p=4992"},"modified":"2022-11-07T15:44:26","modified_gmt":"2022-11-07T15:44:26","slug":"van-elle-take-delivery-of-first-excavator-mounted-telescopic-auger-drive-attachment-in-the-uk","status":"publish","type":"post","link":"https:\/\/www.van-elle.co.uk\/2022\/09\/20\/van-elle-take-delivery-of-first-excavator-mounted-telescopic-auger-drive-attachment-in-the-uk\/","title":{"rendered":"Van Elle take delivery of the first excavator-mounted, telescopic auger drive attachment in the UK"},"content":{"rendered":"\n
<\/p>\n\n\n\n
Van Elle\u2019s Rail division recently took delivery of the first excavator-mounted, telescopic auger drive attachment in the UK.<\/p>\n\n\n\n
The tailor-made KB-70S MOVAX<\/a> piling drill attachment is designed for cast in-situ (concrete) piling.<\/p>\n\n\n\n It is explicitly designed for soil removal tasks and is especially suitable for work in confined spaces, while still being good at reaching over obstacles.<\/p>\n\n\n\n The telescopic\/ kelly bar design keeps the drill height low and allows working on sites with limited headroom without compromising on drilling depth.<\/p>\n\n\n\n The heavy-duty, kelly-bar-type piling drill has a maximum drilling depth of up to 12 meters and will allow us to auger up to 1500mm in diameter.<\/p>\n\n\n\n David Buckley, Director of Rail & Strata Geotechnics, said: \u201cThis important innovation is part of our strategic investment programme to continuously improve the efficiency of delivering cast in-situ foundations on the railway.\u201d<\/p>\n\n\n\n Find out more about our infrastructure capabilities here<\/a> or read our latest case studies here<\/a>. <\/p>\n\n\n\n